Glass Blocks Direct Home Page
BUY BLOCKS WITH FIXINGS
FRAMELIGHT DRY FIX SYSTEM
FRAMELIGHT PV KIT
RODS & MORTAR KIT
BUY STANDALONE BLOCKS
MENDINI COLLECTION
CLEAR BLOCKS
SANDBLASTED BLOCKS
COLOURED BLOCKS
INTENSE COLOURS
PATTERNED BLOCKS
ITALIAN PEGASUS SATIN BLOCKS
ITALIAN PEGASUS BLOCKS
METALLISED PEGASUS BLOCKS
 CLEARANCE SECTION
BUY ACCESSORIES
FRAMELIGHT
FRAMELIGHT PV
CORNER & END POSTS
FINISHING TILES
EXPANSION FOAM & TIES
MORTAR
RODS
SPACERS
SILICONE
 
Choose       Examples Gallery       Contact Us
    My Account      My Cart

First things first: calculate the wall opening

Before anything, you will need to calculate the wall opening for your Framelight PV kit. To calculate the wall opening area, take the following steps:

  1. Take the width of the block(190mm) and multiply by the number of glass blocks you need, we will use 6 for this example: 190mm x 6 = 1140mm
  2. Multiply the width of the spacer joint(8mm) by the number of blocks(6) add 8mm (starting joint), and add it to the above number: 8mm x 6 + 8mm = 56mm
  3. The total: (190 x 6) + (8mm x 5 + 8mm) = 1196mm

Note: The Framelight PV Kit page will automatically calculate the correct opening size for you based on your selections.

Maximum Panel Sizes

Fixed to 1 wall and floor
2200mm high x 1400mm wide (87” x 55”) (11 x 7 blocks)

Fixed to 2 walls, floor and ceiling
3400mm high x 2000mm wide (134” x 78”) (17 x 10 blocks)

Timber, metal or plastic profiles can be applied to cover exposed edges of the glass block panel.

Step 1

All materials such as wallpaper, carpet, lino, laminated flooring, etc. must be removed prior to installation. The structure to receive the adhesive should be clean, dry and strong enough to support the new wall. Ensure the floor is level and the wall is vertical. Fix initial profiles to structure with Framelight PV adhesive. The initial profiles may also be plugged and screwed in addition to the adhesive.

Step 2

Apply Framelight PV adhesive. Each profile should have 2 no. 3-4mm beads of adhesive. Once applied the block or profile must be position before the adhesive begins to skin over. Only apply the adhesive immediately prior to installation.

Step 3

Blocks must always have both adhesive and profiles between them.

Step 4

Continue building courses. The joints between the longer Framelight PV profiles should be staggered. to provide additional strength. Check the wall during construction to ensure the panel is both vertical and straight.

Note: for walls that exceed the length of the profile, horizontal length must be staggered.

Step 5

Grout after 24 hours. The Framelight PV adhesive takes approximately 7 days to reach its full cure.



These instructions are for guidance only. They are not intended to imply suitability for any purpose. Glass block panels are not load bearing. The Framelight PV System is not suitable for fire rated walls.

Related Links

  Framelight PV: An Introduction

  Buy a Framelight PV kit

Yes, we take phone orders! Call 01243 790 425 with your requirements and our staff will be happy to help.
 